Here is what we accomplished (not in order):
1. New window trim
2. New cabinet Hardware
3. Painted cabinets new color
4. New Toe-Kick/heat register
5. New under-sink board
6. New Counter-Top
7. New Sink/Faucet
8. New backsplash
9. New paint color on walls
Basically we did everything except rearrange the floor pad, put in new cabs, and rip up the floor.
We left the appliances alone because they were all new with the house (and we bought the fridge new too).
Here is the fun part!
BEFORE
AFTER